On-site custom design |
| |
- Recommendations for hardware
- Recommendations for client infrastructure modifications
- Design report detailing system installation
|
 |
Off-site procurement, assembly and integration
of hardware |
| |
- System is tested and components delivered to customer
ready for installation
- Off-site software customization, if necessary
|
 |
On-site system installation |
| |
- Final hardware installation and software calibration
- On-site training during system installation
- Site-specific configuration of processing variables
- Commissioning report detailing system install and
calibration
|
 |
Post-installation maintenance period with
on-site systems check and personnel training |